Multipurpose swimming pool of the University of Warmia and Mazury in Olsztyn

9/10
2012

University of Warmia and Mazury in Olsztyn

Olsztyn
  • .......Realizacja

  • University of Warmia and Mazury in Olsztyn

  • Olsztyn

  • 6736,8 m2

  • 3285 m2

  • 9375 m2

  • 2012

  • Maciej Jacaszek, Rafał Jacaszek, Grzegorz Porębski, Roland Kwaśny, Bartosz Zamorski

The building performs a function of a university sports and recreation centre. The facilities inside include a sport swimming pool of 21×25 meters size with an audience stand, pool for learning, whirlpools, sauna complex, sport halls, restaurant and offices.

University of Warmia and Mazury swimming pool building was designed as a consolidated block. The north-west side was “softened” with a curved wall finished with a dominant element of the main entrance. Space arrangements correspond with future urban setting, with a hotel and sports and events hall planned. The south-east side composition contains a dynamic form of a recreational section. With its green roof it merges with natural environment. The arrangement is strictly related to the function of the building – the low, arched roof houses rooms which do not require high and lighted spaces. The support of eaves around the building is to compositionally “break” the high wall and give an impression of the roof to float – these being elements characteristic for sport buildings’ architecture.

arrow-short powrót

Następne projekty