Sports hall in Suwałki

9/10
competition: 2016 technical documentation: 2017

City of Suwałki

Suwałki, Zarzecze

    Warning: Trying to access array offset on value of type bool in /home/klient.dhosting.pl/madedhost/restudio.com.pl/public_html/wp-content/themes/restudio/template-parts/project-content.php on line 58

    Warning: Trying to access array offset on value of type bool in /home/klient.dhosting.pl/madedhost/restudio.com.pl/public_html/wp-content/themes/restudio/template-parts/project-content.php on line 59

    Warning: Trying to access array offset on value of type null in /home/klient.dhosting.pl/madedhost/restudio.com.pl/public_html/wp-content/themes/restudio/template-parts/project-content.php on line 59
  • Executive project

  • City of Suwałki

  • Suwałki, Zarzecze

  • 6 629 m2

  • 5 446 m2

  • 63 500 m2

  • competition: 2016 technical documentation: 2017

  • Restudio Maciej Jacaszek, Rafał Jacaszek, Artur Dubis, Marta Marszałek, Mateusz Butkiewicz

The main idea of the project is spatial and functional integration of the sports and entertainment hall with the stadium building and its surroundings. The hall is intended for sports events (volleyball, handball and basketball) and for stage events (concerts, performances, etc.). There will be space for over 2,000 spectators.

The building was connected to the existing stadium building, which ensures shared use of some of the rooms (to avoid duplication of functions). The body of the building has been optically reduced by withdrawing the higher part of the volume above the pitch in relation to the façade. The facility was designed in BIM technology.

arrow-short powrót

Następne projekty